|
The church is 225 feet long, 180 feet wide at its greatest breadth
and 65 feet high at the facade.
The main church seats 2,000 in the nave, choir stalls, and balcony.
- Architect: Marcel Breuer
- Assistant Architect: Hamilton Smith
- General Contractor: McGough Construction Company
- Project Engineer: Theodore Hoffmeyer
- Stained Glass: Branislaw M. Bak
- Organ: The Walter Holtkamp Organ Co.
- Art Coordinator: Frank Kacmarcik, Obl.S.B
|